PE REVIEW & ENGINEERING / NYC

Electrical Load & Capacity Studies for NYC Buildings

Establish available capacity before adding HVAC, kitchen equipment, EV chargers, or larger apartment electrical service.

Illustrative enclosed electrical panel and test equipment in a residential building.

When this service helps

Before selecting new equipment, establish whether the existing electrical system can support it. A capacity study is useful when an apartment needs more power, a building is considering heat pumps, or a garage is adding EV charging. It can also help an owner compare a limited renovation with a larger infrastructure upgrade.

What the engineering scope addresses

We trace the proposed loads through the equipment that supplies them: branch circuits, panels, feeders, risers, and the building service as relevant to the scope. Available drawings, equipment information, operating records, and site observations form the basis of the assessment. The report distinguishes verified conditions from assumptions and identifies information that remains to be confirmed.

Planning the next step

A panel's main breaker rating alone does not establish available capacity throughout the building. Existing demand, conductor and equipment limitations, and the way new loads operate together all matter. Depending on the findings, the next step may be a design within existing capacity, a load-management strategy, additional measurements, or a service and distribution upgrade. Utility capacity must be coordinated separately when relevant.

Potential deliverables

  • Existing service, feeder, riser, and panel assessment
  • Demand and connected-load calculations
  • Capacity findings, assumptions, and upgrade recommendations

The proposal confirms the exact deliverables and any site visits, follow-up review, filing support, or construction services included.

What to prepare

  • Available one-line diagrams, risers, and panel schedules
  • List of existing and proposed equipment with ratings
  • Available demand records and metering information
  • Access arrangements for relevant electrical rooms

Share what is available and identify records that are missing. We can help define the initial engineering scope around the information and access your project has.

Related guidance

Can Your NYC Building Support More Electrical Load?

Our resource library includes practical checklists and links to official NYC documents.

NYC ELECTRICAL ENGINEERING

A clear scope for your building.

Start with the building, your proposed work, and the information already available.

Request a review

PRIVACY

Your project details.

This website does not send or store the information entered in the project inquiry form. A project brief is generated in your browser only when requested. Downloads are saved to your device, and copying uses your clipboard.

The site does not use advertising trackers or analytics. Site hosting may process standard technical access logs. Typography is loaded from Google Fonts. External resource links open third-party sites with their own privacy policies.

If email delivery is later configured, opening an email draft uses your email application; you review and send it yourself.