PE REVIEW & ENGINEERING / NYC

Short-Circuit, Selective Coordination & Arc-Flash Studies

Assess fault current, equipment ratings, protective-device coordination, and arc-flash exposure within the agreed study scope.

Illustrative close-up of enclosed switchgear and circuit-breaker controls.

When this service helps

Electrical protection studies examine how the distribution system responds to faults and how protective devices interact. They can be important when service equipment changes, new distribution is added, or critical building loads require a coordinated protection strategy. The study scope should identify which parts of the system and which operating conditions are being evaluated.

What the engineering scope addresses

Short-circuit analysis evaluates available fault current and applicable equipment ratings. Selective coordination assesses the relationship between upstream and downstream protective devices using the relevant device characteristics. Where included, arc-flash analysis considers incident energy and associated labeling recommendations based on a documented system model and agreed methodology.

Planning the next step

Accurate input data matters. Device manufacturer and model, fuse types, breaker settings, conductor lengths and sizes, transformers, and available utility fault information can affect the results. The report should identify assumptions and required field verification. A study or label does not replace an employer's electrical safety program, safe work practices, or the need for appropriately qualified personnel.

Potential deliverables

  • Short-circuit calculations and equipment-duty checks
  • Selective coordination studies and time-current curves
  • Arc-flash analysis and labeling recommendations where scoped

The proposal confirms the exact deliverables and any site visits, follow-up review, filing support, or construction services included.

What to prepare

  • Current one-line diagram and equipment inventory
  • Protective-device types, ratings, and settings
  • Feeder sizes, lengths, and transformer information
  • Available utility fault-current information

Share what is available and identify records that are missing. We can help define the initial engineering scope around the information and access your project has.

Related guidance

DOB Electrical Plan Review: Documents to Prepare for an NYC Project

Our resource library includes practical checklists and links to official NYC documents.

NYC ELECTRICAL ENGINEERING

A clear scope for your building.

Start with the building, your proposed work, and the information already available.

Request a review

PRIVACY

Your project details.

This website does not send or store the information entered in the project inquiry form. A project brief is generated in your browser only when requested. Downloads are saved to your device, and copying uses your clipboard.

The site does not use advertising trackers or analytics. Site hosting may process standard technical access logs. Typography is loaded from Google Fonts. External resource links open third-party sites with their own privacy policies.

If email delivery is later configured, opening an email draft uses your email application; you review and send it yourself.